Skip to main content
Mold Tooling Transfer

BRING YOUR TOOL
HOME.

Transferring tooling from another shop or offshore? Our 7-point inspection protects tool life, improves part quality, and gets you to qualified production fast.

See the 7-Point Process
01 · Why Teams Transfer

Three reasons a tool ends
up on our floor.

Every transfer starts with a trigger. We've absorbed tools from all three.

Trigger 01 / 03

Your offshore shop is going dark.

Closures, capacity cuts, and quality drift have put your supply at risk. We re-shore the tool and the program with it.

Trigger 02 / 03

Part quality is slipping.

Flash, sink, short shots, contamination. Symptoms point back to the tool. We inspect, document, and bring it back to spec.

Trigger 03 / 03

You're consolidating suppliers.

One domestic partner. One scorecard. One point of accountability. We absorb tooling without disrupting your release schedule.

02 · The Inspection

7 critical checkpoints.
Maximum performance.

Every transferred tool gets the same teardown. Same protocol. Same documentation. No shortcuts.

Modern Mold & Tool 7-point injection mold transfer inspection overview
Cavity & Core Wear
01Checkpoint
01 · Checkpoint

Cavity & Core Wear

We measure wear, scoring, and pitting on every cavity. Worn steel becomes flash on your part. We rebuild before you ship a reject.

  • Optical comparator scan
  • Surface finish verification
  • Repair vs. replace recommendation
Parting Lines & Shutoffs
02Checkpoint
02 · Checkpoint

Parting Lines & Shutoffs

Flash and mismatch start here. We blue every shutoff, dial in press tonnage, and confirm the parting line seals across every cavity.

  • Layout dye contact pattern
  • Tonnage curve verification
  • Shutoff steel repair if needed
Vents
03Checkpoint
03 · Checkpoint

Vents

Burns, short shots, and trapped gas come from clogged vents. We clear, re-cut, or add venting based on the part's fill pattern.

  • Vent depth audit
  • Flow-balanced re-venting
  • Gas trap remediation
Cooling Channels
04Checkpoint
04 · Checkpoint

Cooling Channels

Scale and blockage rob you of cycle time. We pressure-test and scope every circuit, then document flow rate before T1.

  • Borescope inspection
  • Flow-meter verification
  • Descale or re-drill as required
Ejector System
05Checkpoint
05 · Checkpoint

Ejector System

Bent pins, worn sleeves, and misaligned plates damage parts on every shot. We replace, realign, and verify smooth, even ejection.

  • Pin and sleeve replacement
  • Plate parallelism check
  • Stripper plate validation
Slides & Lifters
06Checkpoint
06 · Checkpoint

Slides & Lifters

Mechanisms fail under cycle stress. We inspect wear, lubrication, and full travel, and rebuild any action that does not move clean.

  • Cam and angle-pin inspection
  • Wear-plate replacement
  • Full-cycle motion test
Hot Runner & Nozzles
07Checkpoint
07 · Checkpoint

Hot Runner & Nozzles

Leaks contaminate parts and burn resin. We pull every nozzle, inspect tips, confirm balanced flow, and replace seals.

  • Nozzle tip and seal replacement
  • Heater and thermocouple test
  • Balanced fill verification
03 · What We Deliver Back

You ship us a tool.
We ship you a program.

The transfer doesn't end at inspection. Every tool leaves with documentation, qualification, and a production runway.

Deliverable 01

Condition Report

A full inspection record with photos, measurements, and a punch list. You see exactly what we found.

Deliverable 02

Repair Quote

Line-item pricing for every recommended repair. No bundled estimates. You choose the scope.

Deliverable 03

Run-Ready Validation

First-article approval, capability study, and signed-off process sheet before the tool runs production.

Deliverable 04

Production Slot

A scheduled press window the moment the tool is qualified. No waiting in a queue.

04 · Timeline

From dock to T1
in three weeks.

A predictable schedule from the moment your tool arrives. No surprises, no excuses.

1
Day 0

Receive

Tool arrives at our Pittsfield facility. Logged, photographed, secured.

2
Day 1-5

Inspect

Full 7-point teardown, measurement, and documentation by our tooling team.

3
Day 7

Report & Quote

Condition report and itemized repair quote in your inbox.

4
Day 14-21

Run T1

Repairs complete. First-article samples shipped for approval.

05 · Results

Built on accountability.

ISO 9001 Registered
In-Process SPC
Keyence & OGP Vision Metrology
Full PPAP Documentation
06 · Start the Transfer

Request your transfer inspection.

Tell us how many tools, where they are today, and what you're trying to fix. A tool engineer will respond promptly.

  • No drawings or CAD required to start
  • NDA available on request
  • Free for qualified transfer programs

We respond promptly. Your information stays with us.