Skip to main content
Retail & Display (POP)

BUILT FOR THE PLANOGRAM.
RUN FOR THE SET DATE.

Display components, sign holders, shelf systems, and merchandising hardware for retailers, brands, and display manufacturers. Molded to survive the sales floor, kitted to hit the reset calendar.

ISO 9001-Certified
Both facilities, independently audited
Two U.S. Facilities
Pittsfield, MA & Ormond Beach, FL
In-House Toolroom
Tooling and molding under one roof
Toner Plastics Group
U.S. manufacturing, under one group
01 · The Reality

The shelf spec
is gospel.

The planogram says which part sits where. The set date says when every store goes live. Between those two fixed points, there is no room for a part that doesn't fit or a shipment that arrives late.

We mold to the drawing. We kit to the store count. We ship backward from the date. Store 1 and store 1,400 get identical parts, on the shelf, on the day.

Technical engineering drawing of retail shelving fixture with dimensional callouts
SPEC LOCK
02 · The Range

If it merchandises product, we mold it.

01/06

Sign Channels & Header Clips

Clear and colored sign holders with cosmetic A-surfaces. Literature holders molded to slot dimensions with no sag over shelf life.

02/06

Shelf Components & Dividers

Shelf systems engineered for load, wear, and years of resets. Dividers held to gauge so every facing sits where the planogram says it should.

03/06

Hooks, Pushers, Trays

Merchandising hardware built to survive restocking, cleaning, and every cart in the aisle. Colors matched to brand guidelines every run.

04/06

Snap Fit Flooring

Snap-fit flooring components designed for clean assembly, durable performance, and a consistent fit across retail environments.

05/06

Counter Display Components

Risers, trays, and countertop fixtures with the finish quality point-of-sale real estate demands.

06/06

Custom Brand Fixtures

Proprietary fixture components molded to your spec and color standard, program after program, rollout after rollout.

03 · The Program

Concept to reset day. Planned backward from the set date.

01

Concept & DFM Review

Geometry, resin, and color standard reviewed by the engineer who runs the part. The DFM happens before the quote, not after.

02

Bridge Tooling

4 to 6 weeks from new program to steel bridge tooling with Incepta Tooling. Pilot stores and program sign-off before production steel.

03

Production Steel

Multi-cavity tooling qualified and maintained in our own toolroom. Tools revised and supported for the production life of the part.

04

Rollout Molding

Documented process control across the full rollout volume. 35+ presses from 40 to 1,000 tons. Two facilities, one ISO 9001-certified quality system.

05

Per-Store Kitting

Sub-assembly and per-store kitting handled in-house. What arrives at each location is the kit that store sets, not a bin of parts.

06

Delivery Planned Backward

Shipping to your DC, your display house, or coordinated to the rollout schedule. When the truck has to leave Friday, we plan the run backward from Friday.

04 · Consistency

Store 1 and store 1,400 get the same part.

A national rollout is one program molded thousands of times. Color, fit, and finish hold across every run, every cavity, and both facilities.

A brand standard that drifts across stores is not a standard.

2 Facilities

Pittsfield, MA and Ormond Beach, FL. Rollout capacity with a second source built in.

1 Quality System

ISO 9001-certified. Both facilities, independently audited. The same standard governs every run.

1 Color Standard

Brand colors matched to standard and held run to run. Store 1,400 matches store 1.

05 · Capabilities

Capabilities with numbers attached.

Injection Molding

Clear, colored, and engineering-grade resins run for repeatable fill and finish across rollout volumes.

Resins
Commodity to engineering-grade

Color Matching

Brand colors matched to standard and held run to run, so the display in store 1,400 matches the one in store 1.

Standards
Matched and held run to run

Insert Overmolding

Soft-touch surfaces, bumpers, and color breaks overmolded onto rigid substrates in a second molding cycle.

Materials
Rigid substrates + elastomer surfaces

Assembly & Kitting

Sub-assembly and per-store kitting handled in-house. Ship to your DC, display house, or coordinated to the rollout schedule.

Distribution
DC, display house, or scheduled
Retail display components installed on store shelving under commercial lighting

MOLDED TO SURVIVE THE SALES FLOOR. KITTED TO HIT THE RESET CALENDAR.

07 · Scale

Built for rollouts.

250,000+

Units per rollout on our largest programs

35+ Presses

40 to 1,000 tons across two U.S. facilities

2–4 Weeks

Typical lead time on tooled programs

The Retail Display Molding Guide
Free GuideThe Retail Display Molding Guide
Free Industry Guide

The Retail Display Molding Guide

Fixture design for molding, resin selection for the sales floor, color management across rollouts, and the timeline math from concept to reset day. Everything a display program owner needs to de-risk the next rollout.

No spam. One-click unsubscribe.

Ready for your next retail program?

Send us your design. An engineer reads it first.

We review the part before we price the program, so the number you get is one the production floor can keep.

  • Engineering-led review
  • A real response, not an auto-quote
  • Built for retail timelines

Or call directly: 413-443-1192